- DL/T5161.7-2002电气装置安装工程质量检验及评定规程第7部分:旋转电机施工质量检验(英文版)
- 中国电力企业联合会
- 38字
- 2025-02-24 21:29:00
1 Generator
1.0.1 Inspection of turbo generator body with 200MW and above is shown in Table 1.0.1.
Table 1.0.1 Inspection of generator proper

1.0.2 Accessories installation of generator is in Table 1.0.2.
Table 1.0.2 Accessories installation of generator
